Day 0: The skip arrived in our driveway. Terry moved the car the night before else we'd be trapped!
Day 1: The builders gutted the old bathroom and filled the skip with all the junk. Terry bought some extra insulation for the ceiling.
Day 2: The bathroom has a new ceiling and insulation.
Day 3: The builders dug a pit to expose the sewer inlet, installed a new underfloor and electric fittings.
Day 4: The bathtub was installed. The builder filled it with water and told us to leave the water in for the weekend until the cement dried.