2007-02-15

Bathroom Renovation Day 7

The bathroom has a new frosted window to replace the old glass louvre one. The old one was an ugly thing; the frame was weatherworn, dust collected at the bottom of the frame and the louvres were hard to clean. The plumbing outside is reconnected to the sewer pipe and we have a diverter valve to water the garden from the bath. The builders have painted some sort of primer to help the tiles stick to the walls.

No comments:

Post a Comment